Quick Request

Request an offer from the selected warehouses. Click on the icon to add more warehouses.

Selected Warehouses:
No warehouses selected.
(m2) (m2)

Warehouse Filter

Rent (€/m2/month)

-

Warehouse Space (m2)

-

Workstation cost (db)

-

Number of workstations

Related news

CTP has a building permit and will complete an industrial complex in Hradec Králové. The developer is doing economically excellent, entering the German market

The European industrial developer CTP has obtained all the necessary permits for the completion of two industrial halls on the outskirts of Hradec Králové. Their construction can start again in November. The new premises, with a total size of almost 13,000 square meters, will be completed in the first half of next year so that the first tenants can move into them in the spring.

Cube to open plant in CTPark Cheb

German bicycle manufacturer Cube is to open a 10,000 sqm production plant in CTPark Cheb in the far west of the country.

HELLA to build new laboratory at CTPark Ostrava

In addition to manufacturing capabilities and an R&D centre, HELLA, a global manufacturer of lights and electronic components for cars, is now building a state-of-the-art testing laboratory in the Ostrava region. The lab will be located at CTPark Ostrava Hrabová, where advanced machines will be simulating the real-life operating environment of HELLA products throughout their entire life cycle.

CTP leases logistics space to leader in new technologies: Bosch is moving from the Netherlands and expanding its activities in the Czech Republic

Leading European industrial developer CTP has provided tailor-made logistics space to international technology and services provider Bosch.

CTP revives areas after the legendary Zetor Brno factory

Companies will use them for e-commerce, research and development and lighter production. This year, the CTP developer will complete the next phase of the revitalization of the Brno brownfield after the Zetor factory near the city center in Brno-Líšeň. After the online supermarket Rohlík, which successfully launched its new storage space here in the autumn, CTP is preparing to open other halls that will be used for e-shops, light industrial production or as business places or spaces for small tradesmen. A total of approximately 75,000 square meters of leasable space is being created within CTPark Brno Líšeň.

CTP issues dual-tranche Green Bond, raising €1 billion amidst strong investor demand

■ Average cost of debt reduced by a further 35 basis points to 1.25% ■ Order book close to €4 billion ■ More than 80% of debt now in unsecured bonds ■ Lowest ever coupon on a 4-year bond for a CEE Borrower

CTP in “Low-Risk“ Category: CTP Places in top 1.5% of ESG Risk Rankings Worldwide

■ Very solid first ESG rating for CTP N.V. by Sustainalytics Inc. ■ RRisk score of 11.0 puts CTP NV the top 1.5% of over 11,000 corporates internationally that have a Sustainalyt-ics score; among real estate companies, CTPs score puts it in the top 5% over 1,000 scored ■ Sustainalytics rates CTP NV Management as ‘strong’ on ESG matters

Developers are most active in the Ostrava region

108 The Agency published the first edition of the original project. A report that provides a clear summary of the most interesting data and information from the industrial real estate market in terms of the share of individual development companies and owners. The updated report will be published regularly twice a year.
Cookie settings icon

Your choice regarding cookies on this site

We use cookies to optimise site functionality and give you the best possible experience.

This site uses cookies to store information on your computer.

Some of these cookies are essential, while others help us to improve your experience by providing insights into how the site is being used.


Necessary Cookies

Necessary cookies enable core functionality such as page navigation and access to secure areas. The website cannot function properly without these cookies, and can only be disabled by changing your browser preferences.